• Instagram
  • Linkedin
  • Twitter
  • Facebook
  • Home
  • Geopost
  • Environments
  • Contact
  • Katalyst
Skip to content

  • Home
  • Geopost
  • Environments
  • Contact
  • Katalyst

Author: geopostenergy

08/04/2022 Drilling / Offshore / Pre-salt

TotalEnergies to Drill Second Well on Campos

After concluding the drilling of the Marolo prospect, which had oil and gas shows, drillship Valaris Renaissance has relocated to

Continue reading

07/26/2022 Ibama License / Offshore / Open Acreage / Seismic

New Spectrum (TGS) Seismic License Over Foz do Amazonas

The company has started the licensing process for a new 3D streamer on deepwater Potiguar (Potiguar Phase 2). According to

Continue reading

07/20/2022 Drilling / Equinor / Offshore / production

Peregrino Resumes Production After More Than Two Years

According to a press release by Equinor, Peregrino is finally back producing since July 16th after production was halted on April

Continue reading

07/07/2022 Offshore

New CGG Seismic License over Foz do Amazonas

Documents obtained through IBAMA show a new Non-Exclusive 3D being licensed on Foz do Amzonas basin, with an acquisition area

Continue reading

06/24/2022 Offshore

Petrobras Drills Wildcat on Offshore Espírito Santo

Petrobras Drills Wildcat on Offshore Espírito Santo Drilling activities began earlier this week, with Ocyan’s drillship ODN II at a water depth

Continue reading

06/20/2022 Offshore

BW Offshore and Golfinho Cluster.

BW Offshore, a traditional player for floating production solutions and the operator of the Maromba field in the Campos basin,

Continue reading

06/09/2022 Offshore / Pre-salt / production / University of Texas

Sapinhoa Oil Files: Reservoir and Production Analysis

by Ila Rae Boley*, Master’s Degree Candidate, The University of Texas at Austin Microbialites in the Sapinhoa Oil Field: Reservoir

Continue reading

06/03/2022 Ibama License / Offshore / Pre-salt / production

IBAMA authorizes two new production units for Campos basin

IBAMA grants the installation license for the Marlim and Voador Field Revitalization project (Campos Basin), where the Anna Nery and

Continue reading

05/20/2022 Drilling / Offshore / production

Karoon Energy Starts Intervention Program at Baúna

After clearing all environmental and legal procedures, drill rig Maersk Developer is already on site for the first out of

Continue reading

05/13/2022 Discoveries / Drilling / Offshore

TotalEnergies Reports Oil and Gas Shows on Marolo

After five months of drilling, the company reported oil and gas shows on the well 1-TOT-2-RJS (Marolo), located in Campos

Continue reading

Posts pagination

«Previous Posts 1 … 11 12 13 14 15 … 23 Next Posts»
Proudly powered by WordPress Theme: Maxwell.

Loading Comments...