Petrobras Gets Green Light for New 3D OBN Survey on Aram
The 3D Node acquisition shall be carried out by the Artemis Odyssey vessel, currently engaged in another OBN acquisition over
The 3D Node acquisition shall be carried out by the Artemis Odyssey vessel, currently engaged in another OBN acquisition over
The Tiê field was declared commercial in 2012, when it was operated by Gran Tierra. It is currently operated by Maha Energy,
After concluding the drilling of the second production well on Patola, the company reported a reservoir quality better than expected
The company completed a formation test on the wildcat 1-BRSA-1381-SPS (Curaçao), located in the Aram block. The test was successful
According to a press release, the well was drilled on a separated compartment from the rest of the producing wells
Another 3D streamer, this time on Foz do Amazonas, is being licensed by BGP. Amapá Fase 1 has an acquisition
The semi-sub is currently chartered to Karoon, and after three well interventions in the Baúna field, is expected to drill
BGP is licensing their first non-exclusive survey in Brazil, over the western portion of Foz do Amazonas and Pará-Maranhão basins.
Last week, ANP released the schedule regarding the 1st Open Acreage Round under the production sharing regime That means, apart from
The company announced yesterday that it is selling 40% of their Working Interest on the Pitu discovery (blocks POT-M-853 and