1st Cycle of the Open Acreage under Production Sharing Regime
Geopost is already updated with the results from the public presentation of offers for the 1st Cycle of the Open Acreage
Geopost is already updated with the results from the public presentation of offers for the 1st Cycle of the Open Acreage
The 3D Node acquisition shall be carried out by the Artemis Odyssey vessel, currently engaged in another OBN acquisition over
The company completed a formation test on the wildcat 1-BRSA-1381-SPS (Curaçao), located in the Aram block. The test was successful
After concluding the drilling of the Marolo prospect, which had oil and gas shows, drillship Valaris Renaissance has relocated to
by Ila Rae Boley*, Master’s Degree Candidate, The University of Texas at Austin Microbialites in the Sapinhoa Oil Field: Reservoir
IBAMA grants the installation license for the Marlim and Voador Field Revitalization project (Campos Basin), where the Anna Nery and
Petrobras confirmed through their Investor Relations a new discovery on Alto de Cabo Frio Central, south Santos basin, at a water
After two months of drilling, the company reported gas shows on the 15th Round block C-M-791, operated in partnership with Chevron and Petrogal. The wildcat
After concluding the drilling of Três Marias (with gas reports), drilling rig Ocean Courage is now on the area of
Shearwater’s vessel Oceanic Vega arrived on site in the end of January and is currently shooting a 3D over three