Karoon Energy Reports Patola Development Update
After concluding the drilling of the second production well on Patola, the company reported a reservoir quality better than expected
After concluding the drilling of the second production well on Patola, the company reported a reservoir quality better than expected
The company completed a formation test on the wildcat 1-BRSA-1381-SPS (Curaçao), located in the Aram block. The test was successful
According to a press release, the well was drilled on a separated compartment from the rest of the producing wells
Another 3D streamer, this time on Foz do Amazonas, is being licensed by BGP. Amapá Fase 1 has an acquisition
The semi-sub is currently chartered to Karoon, and after three well interventions in the Baúna field, is expected to drill
BGP is licensing their first non-exclusive survey in Brazil, over the western portion of Foz do Amazonas and Pará-Maranhão basins.
The company announced yesterday that it is selling 40% of their Working Interest on the Pitu discovery (blocks POT-M-853 and
After concluding the drilling of the Marolo prospect, which had oil and gas shows, drillship Valaris Renaissance has relocated to
According to a press release by Equinor, Peregrino is finally back producing since July 16th after production was halted on April
After clearing all environmental and legal procedures, drill rig Maersk Developer is already on site for the first out of