Last month, on February 28th, PRIO was granted the drilling license for the development of the ๐ช๐ฎ๐ต๐ผ๐ผ ๐ณ๐ถ๐ฒ๐น๐ฑ, located in the Campos basin. Their drilling rig, ๐๐๐ป๐๐ฒ๐ฟ ๐ค๐๐ฒ๐ฒ๐ป, has been on-site since early March to begin the drilling campaign, which includes 4 production wells and 2 injection wells.
Wahooโs production infrastructure consists of a 35 km tieback to the nearby FPSO Valente, located to the south in the Frade field. This production unit has a processing capacity of 100,000 bopd, which is already partially taken up by Fradeโs production, currently just over 40,000 bopd, while Wahoo is expected to reach up to 40,000 bopd.