South Santos Open Acreage Blocks
With the kick-off of the Open Acreage 2nd Cycle, we prepared a series of weekly posts regarding some of the
With the kick-off of the Open Acreage 2nd Cycle, we prepared a series of weekly posts regarding some of the
The Northern portion of the Campos basin Production cluster, composed by Albacora Complex, Roncador, and Frade, is currently responsible for
After having its first request denied by Ibama in 2018, Total once again began an environmental licensing for drilling on
Since when it had its first oil back in the 1970s, the Potiguar basin production development had always been heavily
The transfer of operatorship between Petrobras and Karoon Brasil on the Baúna field is expected to happen in the next
About 10 days ago, Petrobras requested the licensing for 13 new FPSOs on multiple pre-salt assets. From the 10 assets
In 2005, the pre-salt drilling campaign and the subsequent discovery of Lula represented a paradigm shift in Brazil’s E&P scene.
What are the challenges surrounding Saturno Block? The Saturno block was acquired in the 5th Production Sharing Bidding Round by
The FPSO Cidade de São Vicente produced 191,794 barrels of oil during the months of February and March, originated from
Petrobras applied for an environmental licensing to drill the CAIPORA well, on the POT-M-952 block, located in the Rio Grande do