Karoon Energy to Drill Another Control Well on Neon After Preliminary Results
Control well Neon-1 (9-NEO-1-SPS) reached a final depth of 2,382 meters and found 25 meters of net oil pay at
Control well Neon-1 (9-NEO-1-SPS) reached a final depth of 2,382 meters and found 25 meters of net oil pay at
Recently, Petrobras announced the conclusion of a 3D OBN over Itapu, Santos basin. It began at the end of last year and
Cancã field was discovered in 2005 and started its production and development in 2008, operated by Petrobras. In 2018, a nearby block