Tiê Field
The Tiê field was declared commercial in 2012, when it was operated by Gran Tierra. It is currently operated by Maha Energy,
The Tiê field was declared commercial in 2012, when it was operated by Gran Tierra. It is currently operated by Maha Energy,
After concluding the drilling of the second production well on Patola, the company reported a reservoir quality better than expected
The company completed a formation test on the wildcat 1-BRSA-1381-SPS (Curaçao), located in the Aram block. The test was successful